Solar panel repair: what can be fixed
Junction box, diodes, connectors and frame, tested before and after.
Read
Solar panels · Testing
For plant and PMGD owners, operations and maintenance (O&M) contractors, insurers and buyers of used modules. We test at your plant or in our lab, deliver a report for every module and tell you what gets repaired, what gets reused and what gets recycled.
Updated September 26, 2026 · Reviewed by the Ecobaterías technical team
Serial number, electroluminescence image, I-V curve corrected to STC, insulation, bypass diodes and the recommended route: repair, reuse or recycle.
In the lab: 6 minutes per module · 50–100 modules per day.
Sources: Ecobaterías test protocol · IEC 61215-2:2021, MQT 15 (Millennial Solar summary) · IEC TS 62446-3:2017 · 2026-09-26
Ecobaterías tests solar panels at the customer’s solar plant or in the lab, with visual inspection, infrared thermography, electroluminescence (EL), I-V curves corrected to standard test conditions, dry and wet insulation tests, bypass diode checks and detection of potential-induced degradation (PID). We deliver a report for every module with its serial number, measured power as a percentage of nameplate and the recommended route: repair, reuse or recycle. In the lab, the base protocol takes 6 minutes per module.
The terms we use on this page. STC are the standard test conditions: 1,000 W/m² of irradiance and a cell temperature of 25 °C, the same conditions behind the nameplate rating. The I-V curve is the relationship between the module’s current and voltage; from it come the maximum power (Pmax), the open-circuit voltage (Voc), the short-circuit current (Isc) and the fill factor (FF). Electroluminescence (EL) is an image taken in the dark while current is injected into the module: healthy cells emit near-infrared light, peaking near 1,150 nm, and cracks show up dark. Bypass diodes sit in the junction box and route current around a group of cells (a substring) when it is shaded or fails. PMGD are Chile’s small distributed generation plants (pequeños medios de generación distribuida). More terms in the technical glossary.
Testing answers a specific question and ends in a decision. These are its typical uses:
| Use | Question it answers | Key tests | What you get |
|---|---|---|---|
| Manufacturer warranty claim | Is the power loss or defect a manufacturing issue? | I-V curve at STC, electroluminescence and visual inspection by serial number | A report for every module to support the claim |
| Insurance after hail or wind | How many modules were damaged, and which ones can go back into service? | Module-by-module testing: visual, electroluminescence, I-V curve and insulation | Count by type of damage and the class of each module |
| Repowering | Which decommissioned modules can be reused or sold? | Batch sampling and testing of every module that will be sold | P1, P2, P3 or recycling class for each module |
| Buying used modules or a plant | How much real power does what I am buying have? | I-V curve at STC, electroluminescence, insulation and wet leakage | Measured power against nameplate and defects per module |
| Operations and maintenance (O&M) | Where is energy being lost, and what is a safety risk? | Thermography, string I-V curves and Voc per module | List of strings and modules that need work |
Swipe to see the full table
Sources: test report uses (warranty, insurance, decommissioning and buying used modules) described by 2nd Cycle, PV Module Testing · string tests per IEC 62446-1 · P1–P3 classes: Ecobaterías in-house protocol.
If you plan to file a warranty claim, have the modules tested before anyone works on them. According to the Ministry of Energy’s Hoja de Ruta de Economía Circular en Energía 2026–2030 (Circular Economy in Energy Roadmap), manufacturers’ warranties generally do not allow repair or reuse.
For repowering, see also what to do with the modules removed from a plant. If you are buying, see how we present the measured data sheet for each refurbished panel. And if your plant has storage, we also offer lithium battery testing with an SOH certificate. Every service line is listed under services for batteries and solar panels.
Each test sees a different kind of fault, which is why testing combines several: thermography finds the module, electroluminescence shows the crack, the I-V curve measures how much power was lost and the insulation test tells you whether the module is safe.
| Test | What it detects | How it is done and reference threshold | Standard | Where |
|---|---|---|---|---|
| Visual inspection | Broken glass, bubbles, delamination, burn marks, corrosion, damaged frame or junction box, and snail trails (dark lines that follow cell cracks) | At a minimum of 1,000 lux. Broken glass, burn marks or delamination reaching the module edge are rejected | IEC 61215-2:2021 (MQT 01) | Plant and lab |
| Infrared thermography | Hot spots, disconnected substrings, active diodes and faulty connections | With the module operating, at least 600 W/m² in its plane, wind up to 28 km/h and up to 2 oktas of cloud (2/8 of the sky). Cell 10–40 K hotter: class 2; more than 40 K: class 3, safety-relevant | IEC TS 62446-3:2017 | Plant |
| Electroluminescence (EL) | Microcracks, broken cells, cut fingers, inactive areas and PID patterns | Module under forward bias in the dark; images at Isc and at Isc/10 | IEC TS 60904-13:2018 | Lab (dark cabin) and plant, at night |
| I-V curve at STC | Maximum power (Pmax), Voc, Isc and fill factor (FF) | In the lab, under a solar simulator (IEC 61215-2 calls for class CAA or better per IEC 60904-9); in the plant, correction to 1,000 W/m² and 25 °C | IEC 60904-1:2020 and IEC 60891:2021 | Plant and lab |
| Dry insulation | Insulation between live parts and the frame | Modules larger than 0.1 m²: resistance times area of at least 40 MΩ·m² | IEC 61215-2:2021 (MQT 03) | Plant and lab |
| Wet leakage | Moisture ingress and insulation failures in the backsheet or junction box | Module in a solution of up to 3,500 Ω·cm at 22 ± 2 °C; 500 V or the maximum system voltage, whichever is higher, for 2 min; passes with at least 40 MΩ·m² | IEC 61215-2:2021 (MQT 15) | Lab |
| Bypass diodes | Open or shorted diodes and disconnected substrings | Full Voc: healthy substrings; 2/3, 1/3 or 0 of Voc: one, two or three failed substrings. Then the diode is tested in forward and reverse | Voc method (IEA-PVPS T13-37:2026) · IEC 61215-2:2021 (MQT 18) | Plant and lab |
| PID | Potential-induced degradation, shunting or polarization type | Low-current EL image (Isc/10), which reveals shunts and PID, and power loss on the I-V curve | Detection: IEA-PVPS T13-10:2018 · PID tests: IEC TS 62804-1:2025, crystalline silicon only | Plant and lab |
Swipe to see the full table
Sources: IEC 61215-2:2021 preview and IEC listings for IEC 60904-1, IEC 60891, IEC TS 60904-13, IEC TS 62446-3 and IEC TS 62804-1 · IEA-PVPS T13-10:2018 (EL at Isc and Isc/10) and T13-37:2026 (Voc method for diodes) · insulation thresholds per Millennial Solar and Winaico · full links under “Sources.”
Dry testing alone is not enough. In a 2026 study of 37 modules from utility-scale plants, 8.1% failed the 40 MΩ·m² threshold dry and 21.6% failed it wet: five modules would have passed with a dry test only. In a mass-scale reuse project in Queensland (Australia), 331 of 2,200 modules (15%) failed wet leakage, and about 75% of those failures appeared in the first 10 seconds of the test.
According to the IEA-PVPS failure review (T13-01:2014), the most important field failures are in the junction box, the glass, cell interconnections, the frame and the encapsulant (delamination). After 8 years in operation, the junction box and cables account for 12% of failures, burn marks for 10% and the encapsulant for 9%. Early in the service life, 5% of cases are transport damage. Snail trails appear 3 months to 1 year after installation and follow cell cracks: electroluminescence and the I-V curve tell you whether they affect power.
We test wherever it makes more sense for the batch. At the plant, the module is still installed or freshly removed and nothing is shipped. In the lab, conditions are controlled and the STC measurement is direct.
| Aspect | At your plant | In our lab (Santiago) |
|---|---|---|
| Tests | Thermography, string or module I-V curves, Voc per module, array insulation and nighttime electroluminescence | Visual inspection and UV fluorescence, electroluminescence in a dark cabin, I-V curve under a solar simulator, insulation, wet leakage and diodes |
| Conditions | Thermography with at least 600 W/m², wind up to 28 km/h and a nearly clear sky; electroluminescence at night | Controlled: 1,000 W/m² and 25 °C, with a calibrated reference module |
| Throughput | An 8-hour night of electroluminescence typically covers a few hundred modules (industry reference) | 6 minutes per module · 50–100 modules per day |
| Best for | Operating plants, insurance events and locating faulty strings or modules without removing them | Removed or stacked modules, batches to be reused or sold, and claims that need an STC measurement |
| Logistics | Modules stay where they are | We coordinate pickup: freight transport for sound modules and licensed hazardous-waste transport if the batch is already waste |
Swipe to see the full table
Sources: IEC TS 62446-3:2017 (thermography conditions) · Sinovoltaics (nighttime EL) · Ecobaterías test protocol: lab capacity, not a committed lead time.
Drone thermography is the simplified inspection of IEC TS 62446-3: it covers the whole plant and flags modules with anomalies. Detailed ground inspection, electroluminescence and the I-V curve confirm the cause and the power loss. If you already have an aerial thermography report, we use it to choose which modules to test. When modules go to the lab, we coordinate pickup and transport.
In a plant with tens of thousands of modules, you do not always need to test them all. The draft IEC PAS 63525, the IEC’s first document on photovoltaic module reuse (not yet published), proposes two approaches. IEA-PVPS summarizes them in its T13-37:2026 report:
| Situation | Approach | Minimum tests |
|---|---|---|
| Operating plant with even degradation and monitoring data | Statistical sampling per ISO 2859-1 | Pmax at STC, electroluminescence, detailed visual inspection and wet leakage |
| Plant damaged by hail or wind | Module by module | Visual inspection, I-V curve, dry insulation, diodes and electroluminescence |
| Modules stacked in a warehouse | Module by module | Same as above |
| Modules that will be sold | Module by module (recommended by the draft) | Same, plus a reuse label |
Swipe to see the full table
Source: IEA-PVPS T13-37:2026, §3.1.2, on the draft IEC PAS 63525 (stage 40.99 as of August 7, 2026).
Sample size changes a lot with the ISO 2859-1 inspection level: in a plant of 125,000 modules, level G1 means 200 modules and level S3 only 32. We propose the level in the quote, based on how the report will be used and the monitoring data available.
Before sampling, we review the background. The guide from the European QUASAR project (2025) starts with a desk review: the plant’s annual loss should be below typical degradation (about 0.8% per year in that guide), and models with serial defects or market recalls are excluded. As a general reference, the median degradation measured by NREL is 0.5% per year.
A report for every module and a batch summary. Each module is identified by its serial number, so the result works for a claim, an insurer or a sale.
The content follows what reuse schemes require. The R2v3 standard (Appendix G) requires telling the buyer the power measured at STC, its percentage of the design power and every repair performed. The draft IEC PAS 63525 calls for a reuse label that does not cover the original one and lists any repairs, and advises adding the measured I-V parameters. Our report is a technical report: it is not a product certification or an authorization from the SEC (Chile’s Superintendency of Electricity and Fuels).
Testing ends in a route for each module. We use an in-house classification by percentage of nameplate power, together with the electroluminescence and insulation results.
| Test result | Route | Service |
|---|---|---|
| 85% or more of nameplate, no critical EL defects and correct insulation (class P1) | Direct reuse | Solar panel reuse |
| Between 80 and 85% of nameplate (class P2) | Refurbishment and retest | Refurbished solar panels |
| Between 70 and 80% of nameplate (class P3) | Off-grid uses, subject to SEC requirements | Solar panel reuse |
| Fault in the junction box, bypass diode, cable or connector, with sound glass | Repair and retest, with wet leakage unless only cables or connectors were replaced | Solar panel repair |
| Below 70% of nameplate, broken glass, delamination reaching the edge or insulation that does not recover | Recycling with a certificate | Solar panel recycling |
| PID pattern on electroluminescence | Graded by measured power: PID recovery is only partial | By class: P1, P2, P3 or recycling |
Swipe to see the full table
Sources: P1–P3 classes from the Ecobaterías test protocol (in-house classification, not a standard) · IEA-PVPS T13-37:2026 (repairs) · Scientific Reports, 2022 (PID recovery).
Every repair, except replacing cables or connectors, is validated with a new wet leakage test, as IEA-PVPS recommends. PID recovery is not complete: efficiency comes back almost fully at high irradiance, but not at low irradiance. A module with broken glass is neither repaired nor sold. As an outside reference, the European CIRCUSOL project proposed treating a module as functional if it keeps at least 70% of its rated power; IEA-PVPS calls that threshold somewhat arbitrary until regulations exist.
In the lab, steps 3 to 6 take 6 minutes per module, with 50–100 modules per day. That is the lab’s capacity, not a committed lead time: the lead time for each batch is confirmed in the quote.
| Technology | Tests | Note |
|---|---|---|
| Mono and poly crystalline silicon, PERC and TOPCon, with 60 or 72 cells or 144 half cells | Every test on this page | Monofacial and bifacial glass-glass |
| Heterojunction (HJT) | Visual, thermography, electroluminescence, I-V curve, insulation and diodes | The PID standard IEC TS 62804-1 does not cover heterojunction |
| Thin film (CdTe, CIGS) | Visual, thermography, I-V curve and insulation | Quoted case by case; IEC TS 62804-1 does not apply |
| Modules with broken glass | Visual, electroluminescence and I-V curve, for the claim or the insurer | Not repaired or sold: they go to recycling |
Swipe to see the full table
Sources: scope of IEC TS 62804-1:2025 (crystalline silicon; excludes thin film, tandem and heterojunction) · Ecobaterías in-house scope.
We cite these standards as test methods. They are not certifications held by Ecobaterías or by the module.
| Standard | Official title | What we use it for |
|---|---|---|
| IEC 61215-2:2021 | Terrestrial photovoltaic (PV) modules – Design qualification and type approval – Part 2: Test procedures | Visual inspection (MQT 01), dry insulation (MQT 03), wet leakage (MQT 15) and bypass diodes (MQT 18) |
| IEC 60904-1:2020 | Photovoltaic devices – Part 1: Measurement of photovoltaic current-voltage characteristics | I-V curve measurement |
| IEC 60891:2021 | Photovoltaic devices – Procedures for temperature and irradiance corrections to measured I-V characteristics | Correcting field I-V curves to STC |
| IEC TS 60904-13:2018 | Photovoltaic devices – Part 13: Electroluminescence of photovoltaic modules | Electroluminescence imaging |
| IEC TS 62446-3:2017 | Photovoltaic (PV) systems – Requirements for testing, documentation and maintenance – Part 3: Photovoltaic modules and plants – Outdoor infrared thermography | On-site thermography and anomaly classes |
| IEC 62446-1:2016+AMD1:2018 | Photovoltaic (PV) systems – Requirements for testing, documentation and maintenance – Part 1: Grid connected systems – Documentation, commissioning tests and inspection | On-site string tests |
| IEC TS 62804-1:2025 | Photovoltaic (PV) modules – Test methods for the detection of potential-induced degradation – Part 1: Crystalline silicon | Reference for PID in crystalline silicon; does not cover thin film, tandem or heterojunction |
| IEC PAS 63525 (draft) | Reuse of PV modules and circular economy | Sampling approaches and the reuse label; not yet published |
Swipe to see the full table
Sources: titles as listed on webstore.iec.ch and in the official previews of IEC 61215-2 and IEC 62446-1 · IEC PAS 63525 status as of August 7, 2026 · full links under “Sources.”
Sources: SEC, RGR No. 02/2024 · SEC Exempt Resolution 32,427/2020 · ITG RIC No. 9.1/2021 · Circular Economy in Energy Roadmap · Law 20,920 · 2026-09-26
Price and lead time are confirmed in the quote. They depend on:
We reply within 48 business hours with a proposal. Request your testing here.
More answers in frequently asked questions about batteries and solar panels.
Updated September 26, 2026 · Reviewed by the Ecobaterías technical team
Tell us the quantity, brand, model, year, location and the reason for testing. We reply within 48 business hours with the scope, the sampling plan and the quote.