Direct reuse
Class P1: ≥ 85% of nameplate power, no critical electroluminescence defects and correct insulation. Measured-power label, certificate and written warranty.
Photovoltaic module line
Repowering, construction breakage, warranty returns and plant closures. We test every module, repair what can be repaired and sell with measured power and warranty the panels that still work. The rest is recycled with a valorization certificate.
Updated on September 18, 2026 · Reviewed by the Ecobaterías technical team
Visual inspection and UV fluorescence, electrical safety and bypass diodes, electroluminescence in a dark cabin and an I-V curve under a solar simulator with a calibrated reference.
6 minutes per module · 150–250 modules per day and shift.
Sources: Ecobaterías Solar Observatory, cut-off 2026-09-11 · Ecobaterías test protocol · 2026-09-18
The Ecobaterías solar panel line receives photovoltaic modules withdrawn in Chile, tests them in four stages (visual inspection, electrical safety, electroluminescence and I-V curve) and grades them into power classes P1, P2 and P3 for reuse, refurbishment or second life. Whatever fails the test is recycled with a certificate.
| Origin | Estimated volume in Chile | Typical condition | Usual route |
|---|---|---|---|
| Breakage in construction and operation | ≈6,016 t of broken modules already generated in the analyzed fleet | Broken glass or handling microcracks | Recycling and harvesting of frames, boxes and cables |
| Early flow of withdrawals and warranty returns | 55,000–80,000 modules per year through 2029 | Power loss, junction boxes and diodes, corrosion, delamination | Refurbishment and reuse; failure analysis for the manufacturer |
| Repowering as supply contracts expire (2030 and 2033–2035) | 400,000–850,000 modules in PPA expiry years | Modules at 80–90% of nameplate power | Direct reuse with a certificate |
| Commercial and residential rooftops | Not quantified | Sound modules removed on expansion or inverter change | Direct reuse |
| Insurance events (wind, hail, fire) | Occasional | Mixed; decided with unit testing | Per test |
Swipe to see the whole table
Source: Ecobaterías Solar Observatory, cut-off 2026-09-11 (756 plants and 12,884 MW analyzed). The years shown are supply contract expiry dates, not closures announced by their owners.
Class P1: ≥ 85% of nameplate power, no critical electroluminescence defects and correct insulation. Measured-power label, certificate and written warranty.
Class P2 (80–85% of nameplate): junction box, bypass diodes, connectors and cables replaced, frame resealed, with a full retest before delivery.
Class P3 (70–80% of nameplate), off-grid systems only: agriculture, pumping, remote camps, backup and social projects.
Below 70% of nameplate, insulation failure, broken glass or cracked backsheet: de-framing, component harvesting and laminate to licensed recycling with a valorization certificate. See solar panel recycling in Chile.
Source: Ecobaterías test protocol, measured under a solar simulator with a calibrated reference · in-house grading, not a standard · 2026-09-18
Status reviewed on September 18, 2026. The pilot program works with limited batches and case-by-case lead times: we do not commit industrial capacity on lines that are not yet in full operation.
Installers and distributors, farmers and pumping systems, remote sites and camps, telecommunications, backup for small businesses, municipalities and social projects. Each batch is sold by model and power class, with its own data sheet, a 30-module minimum order and a written warranty. Thin-film modules are not reused and go back to the manufacturer’s recycling program.
The laboratory and the plant are in Santiago. From there we serve all of Chile and coordinate pickup with licensed hazardous-waste transport. For sites in Antofagasta, Atacama, Tarapacá and Coquimbo we offer on-site mobile testing: we sort the batch where it is and ship only what still holds value, which is where most of the cost sits.
| Region | Mode | Response to your request |
|---|---|---|
| Región Metropolitana | Intake at the plant and coordinated pickup | 48 business hours |
| Antofagasta, Atacama, Tarapacá, Coquimbo | On-site mobile testing and batch consolidation | 48 business hours for the proposal; visit as scheduled |
| Rest of Chile | Shipment to the plant with licensed transport | 48 business hours |
Swipe to see the whole table
The time shown is the response to your request: we reply within 48 business hours. Testing and pickup lead times are agreed per batch.
Source: DS 22/2025, Ministry of the Environment · 2026-09-18
Updated on September 18, 2026 · Reviewed by the Ecobaterías technical team
Tell us the model, quantity, year and location. We assess the batch and propose the highest-value route within 48 business hours.
The real flow of decommissioned modules and the routes available.
Read
What the EPR law demands from panel importers and installers.
Read