Photovoltaic module line

Used solar panels: testing, repair and reuse

Repowering, construction breakage, warranty returns and plant closures. We test every module, repair what can be repaired and sell with measured power and warranty the panels that still work. The rest is recycled with a valorization certificate.

Updated on September 18, 2026 · Reviewed by the Ecobaterías technical team

Module testing in Santiago

Visual inspection and UV fluorescence, electrical safety and bypass diodes, electroluminescence in a dark cabin and an I-V curve under a solar simulator with a calibrated reference.

6 minutes per module · 150–250 modules per day and shift.

  • 756photovoltaic plants in operation analyzed in Chile
  • ≈34.9 millionmodules installed in those plants
  • 6 minof testing per module: 150–250 modules per day and shift

Sources: Ecobaterías Solar Observatory, cut-off 2026-09-11 · Ecobaterías test protocol · 2026-09-18

On this page

    The Ecobaterías solar panel line receives photovoltaic modules withdrawn in Chile, tests them in four stages (visual inspection, electrical safety, electroluminescence and I-V curve) and grades them into power classes P1, P2 and P3 for reuse, refurbishment or second life. Whatever fails the test is recycled with a certificate.

    Modules
    Crystalline silicon with 60, 72 and 144 half cells, 250–700 W, monofacial and bifacial glass-glass
    Test time
    6 minutes per module · 150–250 modules per day and shift
    Reuse classes
    P1 ≥ 85% of nameplate · P2 80–85% · P3 70–80% (off-grid only) · < 70% recycling
    Warranty
    1 year on refurbished modules
    Reference standards
    IEC 61215, IEC 61730, IEC TS 60904-13, IEC TS 62446-3, EN 50614
    EPR framework
    DS 22/2025: targets enforceable from May 2028; 10% in 2030 and 50% in 2037

    Where the panels we test come from

    Where the modules we test come from and which route they follow
    OriginEstimated volume in ChileTypical conditionUsual route
    Breakage in construction and operation≈6,016 t of broken modules already generated in the analyzed fleetBroken glass or handling microcracksRecycling and harvesting of frames, boxes and cables
    Early flow of withdrawals and warranty returns55,000–80,000 modules per year through 2029Power loss, junction boxes and diodes, corrosion, delaminationRefurbishment and reuse; failure analysis for the manufacturer
    Repowering as supply contracts expire (2030 and 2033–2035)400,000–850,000 modules in PPA expiry yearsModules at 80–90% of nameplate powerDirect reuse with a certificate
    Commercial and residential rooftopsNot quantifiedSound modules removed on expansion or inverter changeDirect reuse
    Insurance events (wind, hail, fire)OccasionalMixed; decided with unit testingPer test

    Swipe to see the whole table

    Source: Ecobaterías Solar Observatory, cut-off 2026-09-11 (756 plants and 12,884 MW analyzed). The years shown are supply contract expiry dates, not closures announced by their owners.

    The four routes of a module

    A

    Direct reuse

    Class P1: ≥ 85% of nameplate power, no critical electroluminescence defects and correct insulation. Measured-power label, certificate and written warranty.

    B

    Refurbishment and return to service

    Class P2 (80–85% of nameplate): junction box, bypass diodes, connectors and cables replaced, frame resealed, with a full retest before delivery.

    C

    Stationary second life

    Class P3 (70–80% of nameplate), off-grid systems only: agriculture, pumping, remote camps, backup and social projects.

    D

    Recycling at our own plant

    Below 70% of nameplate, insulation failure, broken glass or cracked backsheet: de-framing, component harvesting and laminate to licensed recycling with a valorization certificate. See solar panel recycling in Chile.

    Source: Ecobaterías test protocol, measured under a solar simulator with a calibrated reference · in-house grading, not a standard · 2026-09-18

    Status of each service line

    Battery intake and recycling
    In operation
    Battery diagnostics and repair
    2026–2027 pilot program (limited capacity)
    PV module line
    2026–2027 pilot program (limited capacity)
    Stationary second life
    2026–2027 pilot program (limited capacity)

    Status reviewed on September 18, 2026. The pilot program works with limited batches and case-by-case lead times: we do not commit industrial capacity on lines that are not yet in full operation.

    How we test: the four-stage protocol

    1. Intake and inspection (2–3 min)Serial number, model and origin recorded; weighing; visual inspection per IEC TS 62446-3 (glass, backsheet, frame, burn marks, delamination) and UV fluorescence; cleaning.
    2. Electrical safety (1–2 min)Insulation at 1,000 V (≥ 40 MΩ·m² for grid-connected reuse), frame continuity and bypass diode testing. Wet leakage by sampling and on 100% of repaired modules.
    3. Electroluminescence (1–2 min)EL imaging in a dark cabin per IEC TS 60904-13: microcracks, inactive cells, potential-induced degradation, corrosion and solder joints.
    4. I-V curve under a solar simulator (1 min)Maximum power, Voc, Isc and fill factor at standard test conditions (1,000 W/m², 25 °C) with a calibrated reference module. Grading into 5 W power bands and a label with the measured values.

    Who buys refurbished panels

    Installers and distributors, farmers and pumping systems, remote sites and camps, telecommunications, backup for small businesses, municipalities and social projects. Each batch is sold by model and power class, with its own data sheet, a 30-module minimum order and a written warranty. Thin-film modules are not reused and go back to the manufacturer’s recycling program.

    Coverage: Santiago and northern sites

    The laboratory and the plant are in Santiago. From there we serve all of Chile and coordinate pickup with licensed hazardous-waste transport. For sites in Antofagasta, Atacama, Tarapacá and Coquimbo we offer on-site mobile testing: we sort the batch where it is and ship only what still holds value, which is where most of the cost sits.

    Coverage and committed response time by region
    RegionModeResponse to your request
    Región MetropolitanaIntake at the plant and coordinated pickup48 business hours
    Antofagasta, Atacama, Tarapacá, CoquimboOn-site mobile testing and batch consolidation48 business hours for the proposal; visit as scheduled
    Rest of ChileShipment to the plant with licensed transport48 business hours

    Swipe to see the whole table

    The time shown is the response to your request: we reply within 48 business hours. Testing and pickup lead times are agreed per batch.

    Regulatory framework

    • Chile’s Extended Producer Responsibility law (Ley REP, Law No. 20,920): preparation for reuse counts as recovery and comes before recycling in the hierarchy; whoever imports modules for their own professional use is a producer.
    • Supreme Decree (DS) 22/2025: published on 2026-05-07, with targets enforceable 24 months later (May 2028) for photovoltaic modules: 10% in the third year (2030) and 50% in the tenth (2037), measured against the estimated waste of the year.
    • Supreme Decree (DS) 148/2003: a discarded module is handled as hazardous waste unless declassified; we keep the product flow (testing and reuse) separate from the waste flow (recycling). What to require from an authorized waste manager.
    • SEC: only authorized models may be grid-connected; we deliver a per-unit report.
    • IEC 61215, IEC 61730, IEC TS 60904-13, IEC TS 62446-3 and EN 50614: power, safety, electroluminescence and preparation-for-reuse testing. Reference standards for the method, not certifications we hold.

    Source: DS 22/2025, Ministry of the Environment · 2026-09-18

    Frequently asked questions

    What do I do with used or broken solar panels in Chile?

    Do not dump or stockpile them: a discarded module is handled as hazardous waste until it is declassified. Ecobaterías receives batches of used modules, tests them and separates those that still work (which return to the market with a certificate) from those that are recycled with a valorization certificate for Law 20,920.

    How much power does a used panel keep?

    Modules withdrawn in repowering usually keep 80 to 95% of their nameplate power. On the reuse lines analyzed by IEA-PVPS, 50 to 70% of visually sound modules pass. Only electrical testing and electroluminescence confirm it module by module.

    Can a solar panel be repaired?

    Yes, when the fault sits in the junction box, the bypass diodes, the connectors, the cables or the frame seal. Broken glass, delamination and cell cracks are not repaired and the module moves to recycling.

    Can a refurbished panel be grid-connected?

    In Chile the SEC requires modules from authorized models. We work only with models that keep their original certification and deliver a per-unit report; for grid connection we recommend consulting a certified installer. Class P3 modules go to off-grid systems, agriculture and pumping.

    Do you test panels on site before transporting them?

    Yes. We offer on-site mobile testing (I-V curve, thermography and night electroluminescence) to sort the batch and transport only what holds value, with reinforced pallets that cut transport breakage.

    What does it cost to recycle a panel and what is reuse worth?

    According to IEA-PVPS, recycling a module costs 6 to 35 dollars and returns 4 to 13 dollars in materials; a tested, reused module sells for 15 to 45 dollars depending on power and class. That is why the hierarchy of Law 20,920 and the economics agree: test first, recycle second.

    Sources

    • Supreme Decree 22/2025, collection and recovery targets for photovoltaic modules. Ministry of the Environment, 2026. diariooficial.interior.gob.cl
    • Law 20,920 establishing the framework for waste management and extended producer responsibility. Biblioteca del Congreso Nacional de Chile, 2016. bcn.cl
    • Ecobaterías Solar Observatory, cut-off 2026-09-11: 756 plants, 12,884 MW nameplate and ≈34.9 million modules analyzed. In-house methodology.
    • Performance and Reliability Aspects of Second Life PV Modules, T13-37. IEA-PVPS, 2026.
    • Status of PV Module Recycling, T12-31. IEA-PVPS, 2025.
    • IEC 61215, IEC 61730, IEC TS 60904-13, IEC TS 62446-3 and EN 50614. Cited as reference standards for the method.

    Updated on September 18, 2026 · Reviewed by the Ecobaterías technical team

    Do you have a batch of decommissioned panels?

    Tell us the model, quantity, year and location. We assess the batch and propose the highest-value route within 48 business hours.

    • Process authorized by the Seremi de Salud RM (regional health authority)
    • Cobalt sulfate tested at Codelco El Teniente: 22% lower cost
    • We reply within 48 business hours
    • Valorization certificate for your EPR report